Multifunctional Centre of Boucherville - thumbnail 1Multifunctional Centre of Boucherville - thumbnail 2Multifunctional Centre of Boucherville - thumbnail 3

Multifunctional Centre of Boucherville

Turnkey project, integrated into the long range plan of the municipality, where the superficial drainage is collected in sewer pipes and redirected into ditches, towards a permanent pond. This parking has 193 places with a dock leveller drained towards a trench in the building. The design was elaborated by respecting the recommendations of a performance specification while optimizing the costs of construction.

No water retention was required for this project and even the surface of the roof is drained in a pipe emptying into a ditch.


Lemay Associés / Architecture, Design

Completion: 2001
Cette section est optimisée pour Adobe Flash Player, version 8 ou plus.
Installez l'extension Flash.
Top of page Vers le haut de page